Pm me if you wish, We Hired an A frame from a well known hire company to lift out slabs of concrete, the A frame has a swl or wwl of 2 ton and lifted out the first 3 blocks fine, on the 4th block ( heavy'est I might ad) the aluminium frame bent (pictures can be sent if required) not the top bar but the A frame section, they sent their engineer out who said the slab was overweight and returned with a set of calibrated scales, the block was heavy but only weighed in at 1.93, he did say a couple of the bolts where not tightened but it does come part assembled and the bolts mentioned where not the ones we had to tighten, they are sending us a bill for over £1000 for the repair!!
Question is!!! what do we write in the letter denying all resonsability for the failure of their equipment, also the 1 day hire charge they have already sent us when they delivered at 12.30 and the frame bent before 2.30 the same afternoon.
Thanks in advance
Question is!!! what do we write in the letter denying all resonsability for the failure of their equipment, also the 1 day hire charge they have already sent us when they delivered at 12.30 and the frame bent before 2.30 the same afternoon.
Thanks in advance